Project Case

Building Design Capability from Scratch: Taringa! MVP

I diagnosed three structural gaps - design absent from strategy, expensive cross-functional alignment, and design systems not ready for AI - and built the conditions for design to influence decisions earlier and at scale.

Company

Taringa! (IOV Labs)

Date

Feb 2024

Role

Product Design Manager

KPI

122

Role

122

Date

122

Deliverables

122

TL;DR

I joined in September 2022 with the mandate to turn a group of designers with different backgrounds and uneven maturity into a unit capable of covering the UI of a broad MVP in less than four effective months. I negotiated scope with Product, Technology, and Business; structured the team; handled a new hiring to rebalance capabilities; and established the methodology, design system, and operating model that made delivery possible. The MVP reached 5,000 weekly active users in its first three months, while the design system reduced design lead time by half once it was consolidated.

Quote

Context

Taringa!, under IOV Labs, needed to relaunch its platform with an MVP spanning mobile app, web, and internal content-management tools, plus wallet and token functionality across two verticals: Value and Cross.

The challenge was not only product scope. The team had to respond to multiple stakeholders at once, with no established way of working, no shared operating model, and not enough capacity to absorb the full ambition of the release without risking quality or burnout.[Adjunto +1]

That meant the real problem was organizational: the team had to become capable of executing as one system, not as a set of disconnected individuals.

What I built and why

First, I mapped the team’s real capabilities: not just resumes or titles, but strengths, gaps, aspirations, and working style. I needed a grounded understanding of what the team could realistically do before I could decide what it should be asked to do.

Then I negotiated with Product, Technology, and Business during discovery: scope, taxonomies, timelines, working modes, and cross-functional expectations. The goal was not to say yes to everything and transfer the pressure downward; it was to balance real, expected, and desired capacity so we avoided overpromising. My commitment was twofold: protect and enable the team, while taking accountability upward that neither speed nor quality would jeopardize the releases or deadlines. That required evangelizing the value of design, defending its impact, and negotiating the conditions needed to commit honestly — including bringing in Ulises as an additional resource — without overloading the team or hurting motivation.

After that, I set up the full operating structure: workflow, rituals, task management, design system governance, and the collaboration protocol with devs and product owners.

I was not just organizing output. I was building the system that would make output repeatable.

What it looked like in practice

Each designer covered a defined area: Julián focused on Value, Hernán on Cross, Eduardo on visual resources, and Ulises on mobile support, all working from the same documentation base and the same design system.

My role was to remove friction. I made sure the team had enough context, that product owners were aligned, that flows were moving, and that the shared system acted as a multiplier rather than a bottleneck.

In practice, that meant translating business and technical requirements into low-fidelity interfaces, leading design execution across verticals, and coordinating with engineering to keep the implementation grounded in a single source of truth.

What changed

The main shift was not just output, but also capacity.

The team moved from lacking a shared methodology, system, and culture to operating with a structure that could sustain itself without depending on me day to day.

The designers, who started mostly at junior-mid level, went through an intensive learning curve in product thinking and design ops that changed how they worked and increased delivery speed as the project progressed.

And the work did not end when I left: I exited in March 2023 while the MVP was still launching, yet the culture, operating model, and design system continued to work for two more years, with the team remaining solid, cohesive, and increasingly autonomous.

What I learned

  • Design leadership in early-stage product work is not about designing better than everyone else. It is about creating the conditions that allow others to do good work consistently.
  • Stakeholder negotiation is not a side task in design. It is part of the job. If scope is not defined and defended properly, quality and team health both get compromised.


In summary, well-built system outlives the person who built it. That is the clearest proof that the work was real.

​

Project Case

Building Design Capability from Scratch: Taringa! MVP

I diagnosed three structural gaps - design absent from strategy, expensive cross-functional alignment, and design systems not ready for AI - and built the conditions for design to influence decisions earlier and at scale.

Company

Taringa! (IOV Labs)

Role

Product Design Manager

Date

Feb 2024

KPI

122

Role

122

Date

122

Deliverables

122

TL;DR

I joined in September 2022 with the mandate to turn a group of designers with different backgrounds and uneven maturity into a unit capable of covering the UI of a broad MVP in less than four effective months. I negotiated scope with Product, Technology, and Business; structured the team; handled a new hiring to rebalance capabilities; and established the methodology, design system, and operating model that made delivery possible. The MVP reached 5,000 weekly active users in its first three months, while the design system reduced design lead time by half once it was consolidated.

Quote

Context

Taringa!, under IOV Labs, needed to relaunch its platform with an MVP spanning mobile app, web, and internal content-management tools, plus wallet and token functionality across two verticals: Value and Cross.

The challenge was not only product scope. The team had to respond to multiple stakeholders at once, with no established way of working, no shared operating model, and not enough capacity to absorb the full ambition of the release without risking quality or burnout.[Adjunto +1]

That meant the real problem was organizational: the team had to become capable of executing as one system, not as a set of disconnected individuals.

What I built and why

First, I mapped the team’s real capabilities: not just resumes or titles, but strengths, gaps, aspirations, and working style. I needed a grounded understanding of what the team could realistically do before I could decide what it should be asked to do.

Then I negotiated with Product, Technology, and Business during discovery: scope, taxonomies, timelines, working modes, and cross-functional expectations. The goal was not to say yes to everything and transfer the pressure downward; it was to balance real, expected, and desired capacity so we avoided overpromising. My commitment was twofold: protect and enable the team, while taking accountability upward that neither speed nor quality would jeopardize the releases or deadlines. That required evangelizing the value of design, defending its impact, and negotiating the conditions needed to commit honestly — including bringing in Ulises as an additional resource — without overloading the team or hurting motivation.

After that, I set up the full operating structure: workflow, rituals, task management, design system governance, and the collaboration protocol with devs and product owners.

I was not just organizing output. I was building the system that would make output repeatable.

What it looked like in practice

Each designer covered a defined area: Julián focused on Value, Hernán on Cross, Eduardo on visual resources, and Ulises on mobile support, all working from the same documentation base and the same design system.

My role was to remove friction. I made sure the team had enough context, that product owners were aligned, that flows were moving, and that the shared system acted as a multiplier rather than a bottleneck.

In practice, that meant translating business and technical requirements into low-fidelity interfaces, leading design execution across verticals, and coordinating with engineering to keep the implementation grounded in a single source of truth.

What changed

The main shift was not just output, but also capacity.

The team moved from lacking a shared methodology, system, and culture to operating with a structure that could sustain itself without depending on me day to day.

The designers, who started mostly at junior-mid level, went through an intensive learning curve in product thinking and design ops that changed how they worked and increased delivery speed as the project progressed.

And the work did not end when I left: I exited in March 2023 while the MVP was still launching, yet the culture, operating model, and design system continued to work for two more years, with the team remaining solid, cohesive, and increasingly autonomous.

What I learned

  • Design leadership in early-stage product work is not about designing better than everyone else. It is about creating the conditions that allow others to do good work consistently.
  • Stakeholder negotiation is not a side task in design. It is part of the job. If scope is not defined and defended properly, quality and team health both get compromised.


In summary, well-built system outlives the person who built it. That is the clearest proof that the work was real.

​

Project Case

Building Design Capability from Scratch: Taringa! MVP

I diagnosed three structural gaps - design absent from strategy, expensive cross-functional alignment, and design systems not ready for AI - and built the conditions for design to influence decisions earlier and at scale.

Company

Taringa! (IOV Labs)

Role

Product Design Manager

Date

Feb 2024

KPI

122

Role

122

Date

122

Deliverables

122

TL;DR

I joined in September 2022 with the mandate to turn a group of designers with different backgrounds and uneven maturity into a unit capable of covering the UI of a broad MVP in less than four effective months. I negotiated scope with Product, Technology, and Business; structured the team; handled a new hiring to rebalance capabilities; and established the methodology, design system, and operating model that made delivery possible. The MVP reached 5,000 weekly active users in its first three months, while the design system reduced design lead time by half once it was consolidated.

Quote

Context

Taringa!, under IOV Labs, needed to relaunch its platform with an MVP spanning mobile app, web, and internal content-management tools, plus wallet and token functionality across two verticals: Value and Cross.

The challenge was not only product scope. The team had to respond to multiple stakeholders at once, with no established way of working, no shared operating model, and not enough capacity to absorb the full ambition of the release without risking quality or burnout.[Adjunto +1]

That meant the real problem was organizational: the team had to become capable of executing as one system, not as a set of disconnected individuals.

What I built and why

First, I mapped the team’s real capabilities: not just resumes or titles, but strengths, gaps, aspirations, and working style. I needed a grounded understanding of what the team could realistically do before I could decide what it should be asked to do.

Then I negotiated with Product, Technology, and Business during discovery: scope, taxonomies, timelines, working modes, and cross-functional expectations. The goal was not to say yes to everything and transfer the pressure downward; it was to balance real, expected, and desired capacity so we avoided overpromising. My commitment was twofold: protect and enable the team, while taking accountability upward that neither speed nor quality would jeopardize the releases or deadlines. That required evangelizing the value of design, defending its impact, and negotiating the conditions needed to commit honestly — including bringing in Ulises as an additional resource — without overloading the team or hurting motivation.

After that, I set up the full operating structure: workflow, rituals, task management, design system governance, and the collaboration protocol with devs and product owners.

I was not just organizing output. I was building the system that would make output repeatable.

What it looked like in practice

Each designer covered a defined area: Julián focused on Value, Hernán on Cross, Eduardo on visual resources, and Ulises on mobile support, all working from the same documentation base and the same design system.

My role was to remove friction. I made sure the team had enough context, that product owners were aligned, that flows were moving, and that the shared system acted as a multiplier rather than a bottleneck.

In practice, that meant translating business and technical requirements into low-fidelity interfaces, leading design execution across verticals, and coordinating with engineering to keep the implementation grounded in a single source of truth.

What changed

The main shift was not just output, but also capacity.

The team moved from lacking a shared methodology, system, and culture to operating with a structure that could sustain itself without depending on me day to day.

The designers, who started mostly at junior-mid level, went through an intensive learning curve in product thinking and design ops that changed how they worked and increased delivery speed as the project progressed.

And the work did not end when I left: I exited in March 2023 while the MVP was still launching, yet the culture, operating model, and design system continued to work for two more years, with the team remaining solid, cohesive, and increasingly autonomous.

What I learned

  • Design leadership in early-stage product work is not about designing better than everyone else. It is about creating the conditions that allow others to do good work consistently.
  • Stakeholder negotiation is not a side task in design. It is part of the job. If scope is not defined and defended properly, quality and team health both get compromised.


In summary, well-built system outlives the person who built it. That is the clearest proof that the work was real.

​